13 February te 28 February, 12 to 15 hours a acy.
The last WTIC wes
instolted an? checked at 0230 on D-Iny, fcur hours before the shot.
The
whele sectien was relieved and eretified to find that eleven of the twelve
sets on sompling A/C worked perfectly during the first shot.
b.
section.
Intogron:
The Interron was an entirely new instrument to tho
It was stored at LASL during the ipril - Deecriber peric’l and it
wasn't until the section reached the Forward trea thet the pcople respon-
sible for its naintenance had an oppertunity to beeciie foriliar with it.
Sone difficulty was cncountcred during tts installaticn in the NC.
The probe on the instrument had been enlarged, requiring a minor shect
ietel nodification tc cnlarge the fitted hele on top cf the Nadiac Instruiont panel.
In addition, the hcles in the Integron iicunting brackcts
had to be enlarged ant recentered to fit stuts on 4/C mounting brackets.
ce
Jasper:
The Jasper, like the WTIC snd Integron, was first rots ~
tc the section upen arrival in the Forward frea.
No special preblens
were cnecuntered cither with the instrument or with its instellation in
the 4/C.
Ground Equipnent
ao.
AN/PDR 39C (T1-B):
these instrurents.
No unusuel problem arose in preparation cf
However, the initial roquirenont place? on Task Group
7.4 for twenty five cf these instruments was based on the noods of all.
sections of the Nucloer applications Branch,
Prior to the first shot an
e‘titienalrequirenent was place] with the Instrumentation suction to
support the Flyaway projects.
This rotuce? tho stockace <f the inetraicnt
to such 2 peint that no spaces were available at the instrument Inbersterr,
In sciteo instances 27 C's hat to be substitutes fcr the 39 G's,
ager?
LAG