Appendix B — Tables of Relevant Facts
sCIENTIFIC AFTER ACTION REPORTS/INVESTIGATION (SAARD
14.2
104.6
National Academy of Science (travel)
Army Engineer Core Sampling (Cactus Crater)
289.5
National Academy of Science Contract
Soil Sampling, Sediment and Water
271
Analysis (LL)
435.
Total SAARI Costs
18,177.
Total Obligations as of 6 March 1981
MILCON Appropriations
20,000,
Balance (at the time when all accounts are closed,
will be returned to the Treasury of the United States)
1,822.
b. Base Camp Expansion O&M Costs
(1) FY 76 ($ to the nearest hundred) ................. $ 558.
Warehouse renovation
Rehab Chapel
Replace Roof (fresh
water tank)
Repair and clean sewer
Repair and Install
Generator
Repair and Install Salt
Water Pump
Complete Electrical
$12.4
4.5
9.6
17.5.
11.4
6.6
Distribution
Replace Cold Storage
Building
Air-Conditioning &
Exhaust Bldg 462
Repair Consolidated
27.0
Rehab Building 462
17.5
Maintenance Shops
Repair Garbage Pier
22.8
6.0
23.1
Repair POL Lines
Buyandinstall Aqua
Chem Units
Repair Cargo Pier
Rehab Carpenter Shop
Replace Personnel Pier
Activate Fire Protection
System
Rehab Foamite Pump House
Rehab POL Storage System
Repair Fresh Water
Dist System
Repair Salt Water Dist
System
Repair POL Liners
Rehab Building 643
Rehab Mess Hall (Phase I)
2.
73.
21.
2
45,
20.
1.
40.
67
63
20
17
20
4.)
(2) FY 76T .. oc cccccccccccc cece ec e nee e cena eens 115