& Narver that in accordance with the above message, the contractor was
authorized to proceed with the project.
On 27 February 1957 the AEC informed CINCPACFLT by dispatch
that as a result of the evaluation of recent radiobiological resurveys of
RONGELAP and adjacent islands it was determined that the RONGELAP
people could be safely returned to their home atoll; the High Commissioner of the Trust Territories had concurred in this decision; and
CINCPACFLT was requested to implement previously approved plans.
The AEC responsibility was defined as supervision of the services of the
AEC Contractor for construction; the provision of emergency radio facilities
on RONGELAP to the specifications of the Trust Territory Government,
at a cost of approximately $1,500; and annual medical inspection of the
people originally removed from RONGELAP.
the construction was confirmed.
Authority to proceed with
Information addressees to this dispatch
were COMNAVSTA, KWAJALEIN; U. S. AEC, ALOO; CJTF SEVEN;
HICOMTERPACIS; CNO; U. S. AEC ENIWETOK; Holmes & Narver, Los
Angeles; and Department of Interior Offices of Territories.
1-18
OFFICIAL USE ONLY
ret
eee
The Contract Representative, AEC, Los Angeles, advised Holmes
eee
rangements. "'
Oe
Please advise upon completion of ar-
es
fornia, March 25, 1957.
mea
EBEYE to RONGELAP; be available for loading in Oakland, Cali-