NORFOLK
NAVAL SHIPYARD
PORTSMOUTH, VA.
bey
In reply refer to
¥8/8570(271)
(BARDTACK)
>
029
yan 17188
From:
Tor
Commander
Commander, Task Force 7
Subj:
Operation HARDTACK; request for change in radiation dosage limit
Ref:
(a)
(b)
Encl:
(1)
WNavShipYdNorVa conf ltr FS/S11(274h) HARDTACK of 5 Dec 1957
to Chief, BuMed, info copy to Hdgtrs NC AFSWP
BuMed conf ltr BUMED-742:CCBrces Ser 01116 of 13 Dec 1957
to NavShipYdNorVa
Copy of reference (b)
1.
It is understood that the radiation dosage limit for personnel while
2.
Underwater Explosions Research Division Project 3.4 plans for personnel
stationed at EPG during Operation HARDTACK will be established as 3r.
to go aboard the target ships as soon as possible after WAHOO in order to
effect repairs, recalibrate equipment and make preparations for UMBRELIA.
3. In anticipation of the relatively early re-entry needed by Project 3.4
after WAHOO and the extended work requ ted aboard the target ships between
WAHOO and UMBRELLA, it is most desirable that the radiation dosage limit
for Project 3.4 personnel be raised to 4r.
4. It should be noted that no personnel involved in Project 3.4 has ever
participated in an atomic test before and that the earliest possible
participation after WAHOO and UMBRELLA tests will be in 1960.
It should
further be noted that every effort will be made to keep personnel exposure
as low as possible.
5. The Burem of Medicine and Surgery was approached by reference (a) with
respect to this change in the radiation dosage limit and has no objection
to this increase (reference (b)).
6. It is therefore requested that the radiation dosage limit for Project
3.4 personnel be raised to ér.
BEST AVAILABLE COPY
Copies to:
HQ, FC, APSWP (with copy of enclosure)
Dr. W. W. Murray, Project Officer, Project 3.4
/
TJ. SULLIVAN, Jr.
By direction