~ mere weenie oe
ofSPEIER
edie oe
=
.
—
—
or
=
Operation vlan
aG 703 New 1-53
9
WW
ley marker buoys end conduct LOU survey °f certain arcas
7.3.7
(8)
ender direct suppert to “project 1.6 with nodified LOM
76707
(9)
Transport loaded durmy device barge fron PAaKY {sland
LSD.of
(1¢)
to shot sito
Transport loeded dummy device barge from shot site te
72309
LSD of
PARRY Igland,
7339
Commence leying moorings for Project 1.4, 8 Feb,
7.30
Conduct reheersol of cloud sampling eircreft operations
7.3.4
(15)
Ccnduet rehearsal of drone ship operations with eontrol
from aircraft,
746406
(14)
Comoence instrusentation of rroject 1.4,
70305
(1§)
Conduct airborne tests of rroject 1.4 telenetering,
7303
(16)
Transport shot barve loaded with speoial device to shot
LSD of
(19)
Commence evacuation of trailers from shot site,
7.367
(13)
(12)
§.
Operation
(¥)
while underway
sitc.
Pode?
7e309
Shot saetivitios, includin,: Evacuetian
a. The Shot and Evacuation hase will commence ekout six (6) drys prior
to the fixst scheduled snot cand will continue until cbout three (3) days
efter the final snot, rreesnot evacuntion of all or nearly all personrel,
and novenent of verying quantities of equipment, will te required for each
shot et BIXINT atoll,
No generel personnel evacuation nor extensive roverent
ef equivient fs planned prior to the seheduled shot et EsIWETOK »toll, An
energency post-shot evacuation of personnel fro: the non-shot Atoll may be
required,
be ALL snips, except those required at the non-involved Atoll, will eo
te see pytor to each snot and will remedn at sea until efter the snot is de~
toneted end redioloeical conditions periit safe reentry,
Boats and craft
will be loaded on the LSD, or ~o to sea, or be beached or onehored in srfe
loealities iy the lagoon in deep water for cach shot at the vffected Atoll,
Wes.
OES
helt