CHAPTER 18.2
ROLL-UP OPERATION
Except for delays caused by safety considerations, except for min-~
or modifications of originally contemplated procedures to comply with
instructions of the AEC Resident Engineer, and except for minor changes
to meet unanticipated post experiment conditions, the published roll-up
procedure has been or is being followed. Table 18.1-1 indicates the
assignment of roll-up activities to departments of H & N and shows sche-
duled and actual completion by dates and percentages.
TABLE 18.2-1, ROLL-UP STATUS AS OF JULY 15, 1951
Progress - %
iten_
Scheduled
Actual
100%
100%
Scheduled
Completion
Remarks
Design Dept.
Damage Survey and
Completion Report
Data
Campleted
July 6
t.
Zero Area Crater
Surveys
September 15
Delayed
by radio-
activity
in zero
area
High Tide Line
Survey
Existing Structures
Survey
67%
50%
August 5
5%
10%
September 15
Tope 1000! Radius
Zero Areas for 1!
Contour
October 1
To start
July 15
November 30
To start
Resurvey High Tide
Lines at 4-Month
Interval
Revise Precise Con-
trol Field Sketches
18-2
37%
50%
September 1
Oct. 15