JOB 5 WORK ORDERS (Continued)
AEC
W,0,No.
Description
Date
Issued
Site
User
1097
Dig eight foxholes for series 86 stations 5/18/51
E
SBN 2.0
1098
Relocate lead bricks and sandbags.
5/19/51
E
TU 3.1.1
1099
Request for equip. operators & mechanic.
5/19/51 B,E
1100
=Erect tents; cover 14la with canvas;
5/19/51
E+ All Users
1101
Cut 70 three feet long pipe stakes.
5/19/51
E
TU 3.1.5
1102
Install pipe frame-works on reef.
5/19/51
E
J-3
1103
Burn open three sample holders.
5/19/51
B
J-3
1104
Furnish caterpillar & operator to haul
out pipe.
5/19/51
Ew TU 3.1.1
1105
Furnish pump man; erect tent with frame,
5/19/51 E
TU 3.1.5
Furnish labor & equipment to remove
Station 121,
5/21/51
V
Prog. 1.7
1107
Mfgr. box to hold 32 microscope slides.
5/19/51
B
TU 3.1.5
1108
Repair duplicating machine.
5/
B
Ded, TG 3.1
1109
Modify nitrogen cylinder; install in
tower.
5/21/51
E+
TU 3.1.1
1110
Make a wire rope "come-along".
5/22/51
B
J-=3
1111
Gen. overhaul & replace motor in ditto
5/22/55.
B
TG 3.1
1112
Perform miscellaneous work on tower.
5/22/51
Ee TU 3.1.1
1113
Cover Building 212A with tarpaulin.
5/23/51
B
1114
Remove shielding on Sta, 132B for data
recovery.
5/24/51
E
1115
Remove 7 M-G sets from the back of Sta,
5/24/51 E,V
NRLK
1116
Burn open ten sample holders.
5/25/51
J-3
' 1106
17-64
place cots,
machine,
132b.
/51
B
D3
J-3
NRLK
~