JOB 5 WORK ORDERS (Continued)
AEC
W.O,No,
Description
Date
Issued
Site
User
1077
Fabricate & deliver eight 2" pipe sectiong5/16/51
B
J-3
1078
Drill holes in reef; survey work.
5/16/51
E
J-3
1079
Cover J-3 wire rope with sand & sandbags. 5/16/51
E
J-3
1080
Furnish wire rope to Station 18.
5/16/51 D,E
J-3
1081
Install doors on Building 12,
5/16/51 L
SEN 2,0
1082
Load two 1000 lb. spectrographs on truck. 5/16/51
N
NRLH
1083
Place four floodlights on tower.
5/16/51
E
CMR
1084
Wind wire rope onto a spool,
5/17/51
E
J-3
1085
Supply Station 57 with electric service,
5/17/51
E
J-7
1086
Furnish labor to assist in recovering
5/17/51
E
1087
Perform miscellaneous work in tower.
5/17/51
E* TU 3.1.1
1088
Mfgr. one plywood box with hinged top.
5/17/51
B
1089
Move camera flare shield from Sta.#335a
to #69.
5/17/51
E
TU 3.1.1
1090
Survey concrete footing, cable anchors
5/18/51
E
TU 3.1.1
1091
Cancels AEC WO, 1086; Requisition for
5/17/51
E
1092
Supply 4 5 ft. lengths of 3/4" galv.
5/18/51
B
3.1.1.7
1093
Mfgr. 17 boxes for couriering classified
5/18/51
B
JTF-3
1094
Place cameras on collimators;erect tents, 5/18/51
E
J-3
1095
Grade road; build gate; cover connection
5/18/51
E+ Prog. 1
1096
Weld ten sample holders.
5/19/51
B
*
Supplement
equipment,
for tower,
labor, ~~
steel pipe.
files.
hole,
NRLK
NRLH
NRLK
J~3
17-63