JOB 5 WORK ORDERS (Continued)
AEC
W.0,No,
Description
Date
Issued
Site
User
980
Supply lumber & plywood cut to size and
4/28/51 B,D NRLH
981
Replace 2 broken panels on instrument
4/28/51
B
EG&G
982
Widen door opening in tower cab.
4/28/51
V
All Users
983
Install two tents behind Station 132b.
4/28/51
E+ NRLK
984
Install air conditioning at 132b.
4/28/51
Er NRLK
985
Furnish 1 piece 4' x 8' x 5/8" plywood.
4/28/51
B
986
Remove fill & lead bricks; relocate lead
4/30/51
E* NRLK
987
Place two COofire extinguishers in tower
4/30/51
V
All Users
988
Locate, dig & backfill 12 holes for
4/30/51
D
2.4
989
Cancel WO #641; perform misc. work on
4/30/51 DeV
TU 3.1.9.4
990
Labor & equip. for recovery work in
4/30/51
NOBL
991
Remove I beam from tower.
4/30/51
V
J-3
992
Request for 12 each of FS #373 and #288
4/30/51
B
Prog. 4
993
Make three 1/4 inch thick steel plates.
4/30/51 V-D, NBS
994
Furnish labor & equipment to work on
5/1/51
iB
Prog. 6.3
995
Furnish & weld 15 sample holders.
5/1/51
2B
J-3
996
Machine 75 sample holders.
5/1/5l1
2B
J-3
997
Furnish bulldozer & labor to recover
5/1/5l
J-3
17-58
shape,
cover.
bricks,
cab.
expos. units.
Scistat.
tower area,
charts,
tanks,
J=-3 equip.
NBS
B