JOB 5 WORK ORDERS (Continued)
AEC
W,0,No,
Description
Date
Issued Site
User
902
Remove tower cab sheeting; install canvas, 4/18/51
V
TU 3.1.1
903
Furnish one gasoline powered generator.
4/18/51
B
TU 3.1.5
904
Connect two lamps in Station 131.
4/18/51
V
UCRL
905
Requisition for labor.
4/19/51
D
NRLK
906
Cover J-3 cable with sand and sandbags.
4/19/51
E
J~3
907
Construct nine duckboards,
4/19/51
B
RAD~SAF
908
Repair safe in TU 3.1.7 office.
4/20/51
B
TW 3.1.7
909
Make up 75 four foot marking stakes.
4/20/51
B
TU 3.1.5
910
Furnish two pieces plywood.
4/21/51
B
NRLK
911
Install plywood partition with window
4/23/51
B
All Users
gl2
Remove pipe film holders; cut; reinstall. 4/23/51 BAS, NBS
913
Request for removal of photographic
4/23/51
914
Furnish labor & equip. to recover equip-
4/23/51 B,E
915
Provide generator and three laborers.
4/23/51
£E
916
Furnish 4 laborers and bulldozer and
4/23/51
C
917
Provide 8 tarpaulins for various stas.
4/23/51
D
NBS
918
Fabricate steel bench.
4/23/51
D
1.7
919
Remove air conditioning unit from
4/23/51
V
UCRL
920
Make ozalid prints of graphs.
4/23/51
B
D-5
921
Assign additional telephone circuits.
4/23/51
&
Prog. 3
922
Move or remove power lines or poles,
4/23/51
17-54
and ducts,
equipment.
ment,
operator,
station 132a,
Q
D
1.7