JOB 5 WORK ORDERS (Continued)
AEC
W,0,No.
Description
Date
Issued
Site
_User__
808
Move desk & safe; make dark room in Bldg. 4/12/51
B
Prog. 1
g09
Install plywood sheets and paint.
4/12/51
B
JTF-3
810
Provide & install 4 window wind deflec-
4/12/51
B
JTF-3
811
Make twelve wooden plugs.
4/12/51
B
Proj. 6.1
812
Dig ditches around Stations 51 and 50.
4/12/51
D
NBS
813
Furnish one carpenter to work at control
4/12/51
B
3/12/51
B
NRLH
814
209,
tors,
tower,
Mfgr. one photomultiplier tube mount.
;
NRLH
815
Protect air cond., Sta. 6A, 6B; seal
4/12/51
B
NRLH
816
Make five lead discs.
4/12/51
B
UCRL
817
Make two 14 ft. extension cords with cube 4/12/51
B
NOBL
818
Install line & phones from Bldg. 323 to
4/12/51
B
TU 3.1.5
819
Make wood platform with solid floor for
4/12/51
E
820
Supply 30 ft. of suction hose w/connector 4/12/51
E
J-3
821
Furnish and install lock in Building 232. 4/12/51
B
NRLK
822
Surface area from Sta. 41 to waters edge, 4/11/51
S
3.1, 1.6,
823
Furnish lumber; install shielding.
4/12/51
E
NRLK
824
Brace batteries at Stations 54 and 57.
4/13/51 E
825
Wash down roof & side walls of Bldg. 232, 4/13/51
B
UCRL
826
Supply 28 pes. of plywood & 80 pes. of
B
UCRL
roof holes.
taps,
airstrip.
pumphouse,
lumber.
4/13/51.
4.2
NBS
17-49