JOB 5 WORK ORDERS (Continued)
AEC
W.0.No.
Description
Date
Issued _Site
User
789
Replace sash & panes; re~work flashing
L/11/s. $s
Prog.3.3.3
790 *
Sandbag Site "E" Stations.
L/11/51
Prog. 1
791
Move tables, desks & safes; provide a
4/11/51
Prog. 1
792 *
Sandbag Site "V-D" Stations,
4/11/51
793
Dig 1 ditch 60 feet long between Stas.
6A & 6B,
4/11/5l.
V
NRLK
794
Make three Ozalid prints of diagram,
4/11/51.
8B
TU 3.1.1
795
Request for additional survey work.
4/11/51
TU 3.1.1
796
Modify WO.NO, AEC-769; add plywood
4/11/51
&
NBS
797
Relocate two 4' pipes from Engebi to
4/11/51
NBS
798
Miscellaneous electrical work at tower.
4/11/51
UCRL
799
Recover lead bricks from "C"; Distribute
,/11/51 C,E 8.28,
g00
Install fluorescent fixture and wiring.
4/12/51
801
Turn armature down.
4/12/51 ¥V
NRLK
802
Connect 3 phase power to Photographic
Traiier.
4/12/51
NRLK
803
Wire pressure actuator switch on water
system.
4/12/51 B
CMR
804
Cut grooves in two pieces of plywood
and sand,
4/11/51. B
Proj.5.1
805
Remove coax cable from tower on Site E,
4/12/51
E
806
Fabricate two duck boards & two benches,
4/12/51.
B
807
Water stabilization around misc.structures4/11/51 E,S EG&G
*
Supplements
17-48
and siding.
dark room.
strips.
Muzin.
on "EM",
B
Prog. 1
V
LCDR
B
V
EG&G
TU
3.1.1
TU 3.1.5