JOB 5 WORK ORDERS (Continued)
AEC
W.0,No,
- Description
Date
Issued
Site
User
732
Connect line on diffusion pump circuit.
4/7/51
V
UCRL
733
Furnish copper tubing from refrigeration 4/6/51
V
NRLK
734
Construct two plywood boxes,
4/7/5L
2B
NBS
735
Fabricate and install sign.
4/7/51.
«iB
TG 3.1
736
Modify phone service & switchboard con-
4/7/51
C
All Users
737
Dig 2 holes; fill 2 old holes; move Sta.
4/6/51
£
Proj. 5.1
738
Material and equipment to rework tie rods.4/7/51
E
3.3.8h
739
Labor & material for activation of Photo
3/9/51 P,Q
EG & G
740
Furnish rigger to install pipe thru
4/9/51
iE
TU 3.1.4
TAL
Assign maintenance carpenter,
4/9/51
-=B
CMR
742
Perform miscellaneous work in Bldg. 232.
4/9/51
8B
NRLK
743
Dirt or sandbag fill on sides of colli-
4/9/51
E
1.5.2
Thh
Supply labor to help handle radioactive
4/9/51
&E
NBS
745
Check & repair one ditto duplicating
4/9/5.
2B
Das
746
Furnish labor to move 2 mahogany tables.
4/9/51
8B
Prog. 1
TAT
Install additional phone in RAD-SAF,
4/9/51
iB
TU 3.1.5
748
Supply plywood & build filmviewing box
4/ /51
B
EG&G
749
Connect direct phone between Bldgs. 310
4/9/51
B
Prog. 1
stock,
nection.
sign.
Towers.
tower roof.
mator sta.
sources,
machine,
Bldg. 323.
and table.
and 209,
17-45