JOB 5 WORK ORDERS (Continued)
AEC
W,0,No,
Date
Description
Issued
Site
589
Furnish services of clerk-secretary.
3/26/51
B
TG 3.1
590 *
Install chain link fence w/gate and lock. 3/26/51
B
TG 3.1
591
Install electric lamps in two calculators, 3/26/51
B
NBS
592
Remove & store windows and frames.
3/26/51
T
Proj. 3.5
593
Cut I beams, erect tent, & smooth black
3/26/51
E
3.1, 1.6,
594
Supply plywood and standard iron pipe.
3/26/51
B
NBS
595
Paint three signs,
3/26/51
B
Da2
596
Straighten and weld SK-Antenna.
3/27/51
B
NOBL
597
Make connections to allocate telephone
3/27/51 E,D, TU 3.1.5
598
Supply electrical materials.
3/26/51
B
JTF.3
599
Put piles of dirt along cable line,
3/27/51
C
J-3
600 *
Install magnetic switches w/push button,
3/27/51 Tow All Users
er
601
Cut stencils for alphabet and numbers.
3/27/51
L
602
Miscellaneous mechanical work.
3/27/51
B
603
Install lighte in covers of 20 calcula-
3/24/51
B
TU 3.1.1
604
Make post-shot residual strength test
3/27/51
E
3.3.8
605
Make post-shot strength test on pre-cast
3/27/51
S
3.3.4
606
Furnish a direct line.
3/ /51 A,B
607
Purchase 30 large bottles Prestolite.
3/27/51 Various NRLK
608
Manufacture and install 24 feet of duct.
3/27/51
*
Supplements
17-38
top.
pairs.
tors.
on columns.
concrete,
User
4,2
C
V
SBN 2,3
UCRL
TG 3.1,D-3
NRLK