JOB 5 WORK ORDERS (Continued)
AEC
W,0,No,
Description
Date
Issued
Site
User
548
Repair Yagi antenna assemblies.
3/21/51
B
TU 3.1.1.6
549
Furnish material for use by Med-Bio,
3/20/51
L
SBN 2.4
550
Fabricate &install steel strips on
3/21/51
Proj. 3.1
551
Smooth & stabilize an area in front of
3/21/51
Proj. 3.3
952
Provide steamfitter, electrician, and
3/21/51
CMR
553
Transport and erect two radar reflectors.
3/21/51
Prog. &
554
Furnish labor for one day to move boxes.
3/21/51
NRLK
555
Repair one Monrose Calculating Machine.
3/22/51
EG&G
556
Assign & connect cable pairs in Phone
3/20/51
JTF-3
557
Furnish data for rocket launcher instal-
3/22/51
NOBL
558
Remove & relocate outlet strip in Bldg.
210.
3/22/52
EG&G
559
Furnish 2 wood frames & 2 pes. galv.
screen,
3/22/51
TU 3.1.6
560
Install locking bar & locks on 2 file
3/21/51
Proj. 5.1
561
Procure two hand magnifying glasses,
3/22/51
De2
562
Install 6 outlets in Finishing Rm. of
Bidg. 210.
3/22/51
TU 3.1.6
563
Furnish 44 pieces of plywood.
3/22/51
NALK
564
Ozalid 15 copies of drawings.
3/22/51
565
Perform necessary measurements in tower
3/22/51
566
Provide auxiliary power outlets.
3/22/51
17-36
materials.
Exchange,
lations,
cabinets,
cab.
B
<j PY
3.3.8f.
’
Q
blast doors.
B
TO 3.1.1
Prog. 1
TU 3.1.1