JOB 5 WORK ORDERS (Continued)
AEC
W.0,No,
Date
Issued
Description
Site
User
433
Construct & install book shelf, Bldg.209. 3/14/51
B
TG 3.1
434
Furnish labor & material to construct
3/14/51
D
UCRL
435
Manufacture or furnish 4 hot lockers,
3/14/51
V
NRLK
436
Furnish & perform misc. iron work.
3/14/51.
C,
LASL
437
Support to conduct Project 8.2 dynamite
3/15/51 P,Q
Proj.8.2a
438
Install submarine cable between Site A
3/8/51
A
JTF3
439
Fabricate 10 aluminum, non-magnetic
3/15/51
B
Prog. 7
440
Movement of steel boxes from Sta. 95a
3/15/51
C,
Proj. 8.2
441
Furnish material, cut 50 blocks, and
3/15/51
B
TU. 3.1.5
442
Furnish lumber, plywood & hardware for
3/14/51
B
TU. 3.1.5
443
Repair Calculators.
3/15/5l
B
3.1.1
444
Install electrical wiring at Sta. 132b.
3/12/51 V
445 *
Assist in Structures Program damage
3/15/51
E
446
Construct platform for radar antenna;
3/15/51
B
447
Provide electrician to wire vacuum pumps, 3/15/51
E
NRLK
448
Furnish heavy-duty, 4-ton dump truck.
2/15/51
B
T.0.3.1.4
449
Provide salt water line to sinks in
3/15/51 L
#
Supplements
17-30
hot locker,
tests,
and Buoy.
tent pegs.
thru 95h.
plywood,
cabinet,
survey.
and mount.
labs 6 and 7,
_
D,E
P,S
WNRLK
Prog. 3
NOBL,
AFSWP
SEN 2,0