JOB 5 WORK ORDERS (Continued)
AEC
W,0, No,
Description
Date
Issued Site
177
Install convenience outlet strip in
2/17/51
178
Requisition for plywood,
2/17/51 B CTU 3.1.3
179
Install anchor for a one inch nylon
rope.
2/17/51 C
180
Request for miscellaneous work.
2/19/51 B
181
Install power & lighting; relocate
MP shack,
2/19/51 B
182
Bolt four 2 x 4's across ceiling of
working space,
183
Install add. coaxial line; dig trenches,
2/17/51 E,V NRLK
184
Increase rating of utility circuits in
2/19/51 B
LASL
185
Paint and install office designator
2/19/51 B
TG 3.1
186
Install add. electrical power outlet.
2/19/51
B
JTF-3
187
Secure misc, materials & supplies
2/19/51
B
NRLK
188
Manufacture & install bulletin boards.
2/19/51 B
189
Supply 200 linear feet of 1" pipe.
2/17/51 E,V 1.7.1.2
190
Repairheavy shipping crate,
2/19/51
B
191
Request 10 shts.1/2" plywood 28" x 28",
2/20/51
B
AFORL
192
Reinforce two anchors nearest zero.
2/20/51
E
AFORL
193
Locate reinforcing anchors for forward
2/20/51
C
AFORL
194
Manufacture cabinet.
2/19/51 B
JTF-3
195
Install partitions in Building 221.
2/8/51
196
Supply lumber for tent frames, acetylene, 2/19/51
Bldg. 232,
Eldg. 212A.
shingles.
from Honolulu.
cables,
oxygen.
B
User
NRLK
J-7
NRLH
D-2
2/19/51 E,V NRLK
B
E
JTF-3
WNRLK
JTF-3
Proj. 8.2
17-17