RADIVULUUILCAL ULEAINUF UF DINE WLIAN ALULL Mobilization 145 ($IOK); replacement of an elevated water storage tank with a hydro- pneumatic system ($40K): replacement of several 5-ton air conditioning units ($I5K); replacement of a dormitory water supply system ($40K); interim repair of piers ($20K); and repair of fuel fill lines and buoys FIGURE 3-1. DELAPIDATED BUILDING. ($2K).2 Rehabilitation of the mooring buoys and navigational aids in the lagoon was accomplished by the U.S. Coast Guard. The Coast Guard cutter BASSWOOD called at Enewetak on 30 July 1975 for the initial rehabilitation effort and returned periodically throughout the project.3 Until December 1977, there was a Coast Guard LORAN (long-range aid to navigation) station at Enewetak which rendered invaluable assistance in several emergencies and which was a valued member of the Enewetak community. The runway repair work accomplished by Air Force Systems Command in May 1974 was limited to patching potholes and applying a fog seal coat to the central 75 feet. These repairs beganto fail in less than a month.4 Field Command arrangedto have an Air Force engineer inspect the runway on 4 September 1974 and to have POD inspect it on 18-25 September1974 and recommend corrective action. There were potholes, loose asphalt, cracks, and severe ravelingin thefirst 3,000 feet of the runway, plus depressions, cracks, and potholes over the entire airfield complex.6 These conditions caused Saturn Airways, the Military Airlift Command (MAC) contract carrier which served Enewetak, to refuse to land at Enewetak after 9 October 1974 until the runway was repaired.’ Emergency repairs were made by the base support contractor,’ and air service was resumed on 6 November 1974;9 however, the urgency of need for extensive runway repair had been made obvious. The POD report estimated repair costs at $500,000 for temporary repairs and $2,961,000 for major rehabilitation. 10 DNA could justify only temporary repairs since it was not certain then that the Enewetak Atoll Cleanup Project would be authorized by Congress. In transferring the atoll to DNA, the Air Force had agreed to finance runway repairs necessary to give a full year of service. As the year ended, DNA was faced with a $500,000 minimum repair cost. The Air Force agreed to furnish $60,000. DNA obtained $300,000 in O&M funds from DOD and $140,000 by deferring an approved Johnston Atoll project to pay for Enewetak runway repairs.!! Arrangements were made with POD to have the runwayrepaired by one of their contractors, Martin Zachary, who Ww necessary environmental assessment and permit to use the old quarry at Medren (Elmer) Island as a source of aggregate for the project.!2 When FIGURE 3-2. DELAPIDATED BOAT DOCK. the project was delayed several months by paperwork and nonavailability of ships to move paving equipment to Enewetak, the runway was kept open by removing loose asphalt and patching potholes. In August 1975,

Select target paragraph3