Funding procedures in connection with this Operation will be in
accordance with Headquarters USAF AIMAJCOM UNCL Message, Cite AFABF/3-1372/56,
- dated 1, Saptember 1956, HOTA«,
19. Direct communication between all addressecs of this message is
authorised for the purpose of implementing this directive.
-
20, Task Group 7,4will controlthe movement ofell Air Force units end.
@lenents to the forward area on the authority of Movement Direotive issued ty
Headquarters USAF,
.
:
|
Pood
LU:
21, Joint Task Force SEVEN is authorized operational control for planning|
and coordination of Task Group 7.4 and its units during the period prior to ©...
movement to forward areas, Commander, Task Group 7.4 will exercleu opera- |
tional control for planning and coordination of all units and elements assigned
or attached ‘during period prior to movement to forward area, After movement “""*
to forward area, Commander, Task Group 7.4 will assume full operational control
of all units and elements assigned or attached and Joint Task Forces SEVEN will
22,
Major and/or (Commands will furnish Commander, ‘Task Group 7.4) info"
Headquarters Joint Task Force SEVEN with unit designated from which above
elements will te furnished and name of project officer at earliest practicable
se
assume full operational control of Task Group 7.4.
23. The Department of the
has agreed to place’on loan to ARDC (withe-
maintenance personnel) three (3). each L~19 afroraft with neces—' out
sarycrews
partsand
and specialized maintenance equipment for duration ofthis operati
ons.
24.
"
.
,
oe
so.
c OMB. a.
8 Ege OS
Portions this message pertaining to Department, of the Army and Dee:.
partment of the Navy participation have been coordinated at DCS/Log and OPKAY: -
level peapectively.
25-
coe
For planning purposes tentative operational in place dates in the
Proving Ground area for aircreft ares 15 each H-19 (or combination H-19 and
H-21), PACAF, 11 are in place, 2 additional 15 Dec 57,.2 additional 1 Jan 58.
Eight (8) each L-20, ARDC, 6 in place, 2 additional 2 Jan 58 Three (3)
each 1-19, 2 Feb 58, ARDC, Ten (10) each WB~50, 1 Mar 58, MATS, Ten (10)
each B-57B, 15 Mar 58, ARDC. Six (6) each B-57D, 15 Mar 58, SAC. Five (5)
each C-54, 2 in place, ARDCs. 2 additional 15 Deo 57, PACAF: 1 additional 15
Jan 58, PACAF,
Three (3) each C-54 serial photo 1 Mar 58, MATS.
Seven (7)
each SA-16, 1 Mar 58, MATS. One (1) each B-52 with MSQ-A, 1 Mar 58, ARDC,
Two (2) each B~36, 1 Mar 58, ARDC.
(3) each B47, 1 Mar 58, SAC.
26.
One (1) each C-97, 1 Mar 58, ARDC,
Three
Consideration will be given to reemployment, where practicable, of
materiel designed, modified, and instrumented for previous tests.