Ltr, SWS, 4950th TESTGU(N), dtd 24° Jul 57, “Comments to Final Report of the
~
Commander, TG 7,4, Operation REDWING"
ITEM
38.
REFERENCE NO
COMMENTS
TII PV A, paras
See Item #4, page 2.
4.5 -~ 4.10
An SOP has been set up to
permit early end forceful followup of all delin-
quent reports.
If the present time scale can be
adhered to all requirements will be carefully
scrutinized for accuracy and elimination of
39.
III P
Wn <4
excesses.
A, paras
29
The establishment and maintenance of stock record
cards have been prescribed in the TG 7.4 logistic
Support Concept which has been distributed,
This
procedure will be further described in the TG 7.4
Logistics Support Plan scheduled for publication
1 August 1957. The present time scale for proces-
sing of requirements lists will permit the estab-
lishment of a timely and workable arrangement for
servicing of the using elements,
Detailed procedures
will be published by the Test Base Unit (the 4951st).
The experience level of personnel assigned to AFB
2872 is excellent, The Director of Personnel, 4950th
Test Group is closely monitoring the assignment of
personnel,
The requirement for augmentation of AFB
2872 has been spelled out in the TG 7.4 Logistics
Support Concept and will be specified in detail in
the TG 7.4 Logistic Support Plan,
40.
III P V A, paras
6.3 - 6.12
Drawings have been received, and approved by this
Headquarters, for expansion of the POL storage
facilities on FRED, This expansion, which will
increase our aviation fuel storage capacity by
840,000 gallons will eliminate our storage problems
as recognized at this time.
41.
42,
43,
III P V B, paras
III P V B, paras
1.6 & 2.4 ~ 2.6
I
3.32-3.6
B, paras
& 4,3-4.5
It is planned to establish a Maintenance Control
Unit for HARDTACK, Preliminary drafts of SOP's
are being prepared.
See Item #41 above, Detailed experience levels will
be prescribed for field maintenance augmentation
personnel to be furnished by elements of TG 7.4.
Detailed requirements for MCU communications have
been established,
It is planned that MCU personnel
will deploy to the EPG in sufficient time to permit
& Complete check out of MCU communications facilities,
Also see Item #5, page 2.