CHAPTER I!, SECTION 3
to enter the station from detector Stations 1318
.02 and .03. Two new coaxial cable air dryers
were required. Power requirements were 15 KW,
120,208 volt, 3-phase. Five timing signals and
a go-no-go-circuit were to be provided. Rehabili-
tation started on 21 April 1956 and, at User
request, was stopped at 50% progress due to
the cancellation of the Pawnee event.
1318.02
Alpha Detector Station
Janet
DOD-13
5
USER:
1318.03
feet thick walls. A tunnel 24’ x 16’ x 15’ high ex-
tended from one end of the building to the cen-
ter of a 66’ long 3’-thick retaining wall. Approximately 10 of earth covered the tunnel and building. Because of the high loadings, the main rein-
forcing was placed in two layers throughout
most of the structure, and stirrups were install-
ed in the mannerof straight reinforcing in sev-
eral layers and parallel to the main reinforcing.
Within the building, two heavy lead doors re-
The tunnel entrance at the retaining wall contained a 3’-6” x 9-6” steel-framed blast door.
5
Station 1316, Yvonne, with exceptions as noted
below. The concrete bin was located on only
one side of the detector cubicles, and only three
each 3’x4’x3’-6” detector cubicles were re-
quired. Three 12”-pipes were to be used with a
clear line of sight to the working point of Station 5. The working point of the detector heads
were to be 20” above the cubicle floor. Progress
-
4-12-56
quired casters at the floor to support the weight.
Detector Station
Janet
This station was designed for use similar to
Me
anccol
1319
Alpha Recording Station
Charlie
LASL
18
12-12-55/5-5-56
Station 1319 was a reinforced concrete
building 26’ x 31’ x 15’ high with 51% to 6%
work was stopped on this station at the progress stage of 67% complete because of the cancellation of the Pawnee event.
PURPOSE:
SITE:
STATION:
SITE:
SITE:
USER:
PARTICIPATION:
CONSTRUCTION:
OCCUPANCY:
This station was to be a User-furnished
detector mounted on a portable wooden skid
and connected to Station 1317 with coaxial
cable. On 16 May 1956 and at User request,
STATION:
was stopped due to cancellation of the Pawnee
event.
Power was provided by two 30 KW, 120/
208 volt, 3-phase portable diesel engine-driven
generators mounted on a concrete slab approximately 45 feet from the station. One generator
provided power for normal needs; the other was
used as a stand-by unit. A 10 KW dummyload
was tied into an automatic transfer switch so
that the stand-by generator was loaded when
not used for station power. Each generator was
connected into a 36-circuit power panel through
wet
-~
monge.
“
~
vf
STATION:
PURPOSE:
SITE:
USER:
PARTICIPATION:
of this station reached 67 percent when work
aes
man ae
7
'
- f
=e
oo
e
ae
Figure 2-72.
Page 2-86
8
eaa Ek s
‘~
ae a
Se
x.
-
i tm,
2
oe
a
oo
pcr
natnag
.
+ Atanas
Tal
oa
Station 1319 - 72% Complete