60 SITE: Nan USER: DOD-2 PARTICIPATION: 11, 18 and 22 CHAPTER II, SECTION 3 STATIONS: PURPOSE: SITE: 265.01 thru 265.02 Fall-out Distribution Bikini Lagoon This station consisted of space in an existing magazine and was used as a receiving and USER: DOD-2 PARTICIPATION: Stations 11, 13, 18 and 22 ronic equipment, requiring 5 KW, 110-volt, Stations 265.01 and .02 were User-furnished, and consisted of moored YFNB barges equipped with two blue box and radio timing signals of minus one second. Power was supplied thru barge generator equipment. recording station for the rocket launcher Station 261.01, How. Four racks of User-furnished elect- single-phase power, were installed. Power was furnished by the normal island supply and back-up power was supplied by a 20 KW emergency generator. Antennas mounted on poles picked up signals from Station 261.01, How. Two pair of wire for monitoring were run from Station 261.01. Minus-one-minute, 2-1/2seconds, and one-second timing signals were required. STATIONS: PURPOSE: SITE: 263.01 thru 263.18 Fall-out Distribution In Ocean (Bikini) USER: DOD-2 PARTICIPATION: 11, 13, 18 and 22 These stations were User-furnished and installed and consisted of skiffs moored in deep water. A 10,000 square foot area was provided at Nan to support project work on the skiffs. STATIONS: PURPOSE: SITES: 266.02 and 266.03 Fall-out Distribution How and Love USER: DOD-2 PARTICIPATION: 11, 13, 18 and 22 These structures were existing CASTLE Stations 251.02 and 251.03 and consisted of concrete boxes 6’ x 6’ x 3’ deep. It was necessary to place backfill and level the stations to meet original conditions. Minus 2-1/2-seconds and one-second timing signals were provided. STATIONS: PURPOSE: 267.01 thru 267.03 Fall-out Distribution SITE: Bikini Lagoon USER: DOD-2 PARTICIPATION: 11, 13, 18 and 22 These User-furnished stations were moored pontoon rafts containing fall-out sampling equipment. STATIONS: PURPOSE: SITES: 268.01 thru .22 Fall-out Distribution Able, Charlie, Dog, Fox, George, How, Love, Nan, Oboe, Uncle, Victor, Yoke and Bravo USER: DOD-2 PARTICIPATION: 11, 13, 18 and 22 CONSTRUCTION: 1-5-56/5-24-56 These stations were the existing 252 series of CASTLE, which were leveled for Operation REDWINGby placing them inside of a new concrete foundation. The stations were concrete, 6’-10” x 2’-6” at one end, 4’-8” at the opposite side and with a depth of 1-814”. A battery pit was in one end of the station and a fall-out collector in the other. The stations were located in a 100’ square clearing. Requirements included a battery for supplying power and two blue boxes. Each station contained 2 cubic yards of concrete with an average strength of 4,700 psi. Figure 2-52. Station 262.01 Stations 268.01 thru .12 were precast at Nan and 268.13 thru .22 were precast at Tare. All of the stations were transported to their sites via LCM andplaced with a forklift. Page 2-69

Select target paragraph3