YCKE TEST
Yoke test operations were carried out in the same manner ard on
the same approximate time schedule as for X-ray test.
Several Additional
missions were flo in connection with the operation and T.U, 7-6.1
personnel were pushed to the limit of physical endurance to maintain
their operations schedules,
Fall out occurred on Kwajalein on Yoke plus one and a radiological
control center was established.
collected for counting.
Surveys were made and vater samvles
The contamination was short Lived however and
by Yoke plus three had disappeared,
All. operations in connection with the Yoke test were canpleted by
Yoke plus nine and preparations were completed for the Zebra test very
shortly thereafter.
ZEBRA TEST
The expericnce gained on the first two tasts, plus the curtailment
of operations for the Zebra test, made this operation a canparatively
simple one.
The test went off without incident.
All possible data was
obtained,
|
POST ZEBRA DAY
Col, Isbell, departed for Hawaii on Zebra plus two to participate on
the Task Force Awards Board amd Lt.Col, Cody assumed command of the unit.
On Zebra pins one roll-up of the unit began.
for the ZI on exergency leave,
Three monitors departed
Final missions were completed and equip-
ment turned in.
-
wer?
Se:
az
2
2k
92 -
maniete
”
a
eer
:
mee
ae
s
eee Si romper iy tae_— ioe shel
Fou
Hag
Ke
oat
ene
LiesBee: ee
a
233 2x
ESS
ae ee
7.
Px<é
;
A
fA
oe
“es
PG,
tie
theais
te ea SaTA eefee
BU
ES
Ne eh es
eye
So
’
one TR
rhea
eee ts Eeehee
oa
CON
a re.Oa a \
aed
AE ces
ge Py