UNCLASSIF ig
TTrTN
H.
bANN
Helicopter:
1.
MONITCR REQUIREMENTS
Tovals
k Guiding.
Two tank
.ding aircraft (one being
spare) wi. Lc
have a pilot and a
tank operator
-card,
The tank opor-
ator (frem TG 7.1) will be spectally
Gestgnated as a ronitor.
These atr-«
eraft will at all times cperate over
arenas whore tho ground intensity is
less than 100 rr/hr.
I.
Helicopter Recovery Parties.
1.
1
Soon after the detcnation tnree
helicopters tuko off from the CVE
for the tank revetrent cn the Zero
Island.
One TG 7,6 monitor will be
on boird the first helicopter to land
on the fsland, This monitor will
clear the landing of the helicopters
and will assist in monitoring tho
land cable operation (works with the
AVR monitors after arrival at Zero
Island).
2e
J.
This monitor wlll also accompany the
part of the crater sample which is to
be returned to the CVE by helicopter
or smill beat,
Tecehnierl Phetogriphy Recovery and jorman
Survoy.
le
About 1200,
2
X minus 2 day, two TG 7,6
nmoritors aly be placed on
Scen ifter the shot, these
will cmbark on a boat from
pool with the photographic
partys
Eniwetok.
monitors
the boat
rocovery
26
One moniter will serve for the film
recovery from the lagoon and the scman
Towers.
3e
Tho second monitor will survey sonan
Island whtle the film is being recovered. This survey will clear Aonmsn
in ordor that partics from the iV-d
may go to work on oman as soon as
pessible.
«A jcep will be left available on Aomin for this survey.
aAV-5 Monitor.
1.
_
1
One TG 7.6 monitor will be on beard
the .V-5 to monttor the reception of
radioactive mitcrrials from the Zero
Island,
20
“ho TG 7.6 monitor will work cnly on
topside of the /V-5. It 1s assumed
that TG 7.1 will do responsible for
radiological safety within the aV~5,
using AEC safoty porsonnel.
tices
wha
pete
REST AVAGLASLU
aw
x
F
;
ow
ry i
Bee
r
ER Fee Soe
Ta wee
ce
—?
3
a
Bae oe
2
ha @
ae
eo
7g
AIRE
.
on
enya!
aaa te
C3of
K,