COCR
J3~DDH-E105
29 May 1956
(11)
The first timing signal will be sent at H-30 minutes.
(12)
A request will be made to CJTF SEVEN that the briefing scheduled
(13)
On the -4 day at 1300 hours there will be a full signal dry run.
hour signal will be by hack only,
The one
for 30 June be delayed at least 24 hours,
(14) Col Adams outlined the communications plan for TU-3 which is, in
general, as follows:
1 net from USS MONTICELLO to USS BOKER
1 net from USS MONTICELLO to ATF-100
1 net from USS MONTICELLO to ARS-24
MUDBANK Net (45 Mcs) onother craft of the target array.
2e
PUBLICATIONS:
The following document was published and distributed this date:
1919-JFE
3.
Operational Letter ROGE ~ 1 = Prediction of Effects and
Operational Planning Factors
29 May 1958
SHOTS and DEVICES:
a.
ROSE was moved from the Assembly Compound to the deep water pier today and
loaded on Pinex Barge #29.
at 1100,
in its zero position today.
sent to YVONNE,
b.
The barge departed for Station #29 off YVONNE
It is expected that the moorings will be laid and the barge moored
LCU-469 (house boat) and a "M" boat were also
-
LATER — ROSE moored at 1500 hours and TEXAS was notified,