_TO22950377
F-179 7-925 P-a2z
LS REECO L.U._ NU.
|
FEB @3 9g -
12:16
CA the 4
&
NO closure was recommenis2 os ais and surface
routes through Veks and Ewajelein.
:
- Be No transient shipsins was reported withia Soc
miles of Ground Zero. It was pointed out thet 3 minus 2 esd B
minus 1 B2V sweep hed been sent out on headings of 306 desrees
and 330 degrees respectively.
This was besed on sarifer corse
casts. Since the wincs shifted around to a narrow band to the
ENE, it was recommended that a & dey PeV sweep along a bearing
line approximately 65 degrees be laid on.
;
“i.
following:
js
It was recommended thst cricrac be azvrised or tke
r3
:
{1}
72 hours trsjectories.
(2)
Very favorable outlook for native populations,
(3)
No interference or the eir and surface routes.
It was recommsnded thas no change be mate in che
position of the task force ships.
.
4.
In summary, it was recommended that RadSave conditioas
be considered very favorable on all points, but only <avorable
at Bikini shot atoll.
BR. 4. HOUSE
duh
col. 2
tsar
Radsafe Officer
5008 b4S