DLANG FOR
Page
Till
Fur
t&
two
>
Once collected
the
Vil,
entire
LOGLOTLIOS
A,
\e
team;
the
data quickly
field
and
ledibly
reoresentatives,
ONL
avallabiec
and
for
consultants
( iaterials)
need
each
is
a
basic check-list
survey
of
people.
of
the
to cover
The
prior
of
sunplies and consummables for
(data base
sample
and
number will
survey and
sick call)
be
for
determined
any additional
input
“X"
number
by a
review
the
field,
from
plus:
1.
2.
Special
equipment
and consummables
studies
requested
by consultants
for
by
B.
To
new tests
either
added
to
required
for
snecial
or collaborators
the
data
base
or
demanded
new circumstances
insure continuity
in
pre-planning the
following will
be
required:
VII.
1.
a six
(5)
months pre-deployment check
2.
a.follow-up check
List at four
month and two (2)
weeks,
to
(4),
list
two
(see enc.
(2),
one
1)
(1)
insure material readiness
LOGISTICS (Personnel)
A.
The
examination
specified
as $00n as
notified,
including DOE
services),
magistrates
B.
schedule
and
the
the
next fiscal
(DC,
Nevada,
goals for
should
PASO),
DOT, TT
oe
(Health
BNL field representatives,
representatives of
each
year
possible and all interested parties
DISTAD Marshalls,
The make-up of
upon
for
each
island
field survey team will
each specific
to
be
island
visited
be conditional
survey
FIELD SURVEY - FY 1979
DATES and DURATION
FIRST
January 15 thru
February 22
s?
~ - [G18
5 Weeks
Area of
Concentration
Staff
1.
Thyroid
1.
Thyroidologist
2.
OB-Gyn
2.
(3)
3.
Hematology
3
O8-qyn Spec,
4,
Sick call
4,
Wurse
Prac.
BS.
dix
3.
Tech.
staff
& PE
Internists