quantity of AEC unclas sifiied
or blueprints
will be brought
sideration.

9(
ET

technical
data in the form of drawings
to the Commission
for individual
con-

During the above discussion
Messrs.
Fine, Platt, and Wailer
entered
the meeting
and at this point Messrs.
Warren,
Johnson) Fleury~ and
Straus cr left.
13

●

ilEC

426 - Initiator

Program

,’

.,’

,..
,.
..
,’. ,
.:. ,.
,!.
. .

;.’.

Under consideration
was a report
(AEC 426) concerning
projected
future requirements
for initiators
and their critical
materials,
and
means for their production.
Mr. Boyer pointed out that the present
report did not recommend
any change in the principle
of parity between
cores and initiators,
though study would be given to the subject.
In re spons c to questions
from the Commissioners,
Mr. Williams
commented
on the limitations
of the Brookhaven
reactor
for emergency
or supplemental production
of initiator
material,
and on other possible
alternate
producers.
He pointed out that relief
either from development
of substitute materials
or from successful
operation
of the Mk. I or Mk. IV
For a relatively
nominal sum, however,
a high
MTA was uncertain,
performance
reactor
optimized
for production
of Po-21O could be designed for construction
at a location
separate
from other production
afford indispensable
insurance.
He
facilities
and bombproof,
and thus

.,. .
....
...
,.

pointed out that, despite progress
made in work on this problem
for
several
years, the production
of initiator
materials
still remained
a
particularly
vulnerable
point and he urged that the Commission
authorize
having design of such a high performance
reactor
completed
and ready
for any need.
Mr. Wcil said that design of the CF-5 reactor
was WC1l
advanced and that the principle
change for design of a production
adaptation would be in the shield.
Early selection
of a site was necessary,
however,
since the site would affect the design.
hLr. Smyth said that he did not think construction
of such a reactor
should be authorized
independent
of consideration
of the results
of the
other studies recommended
in AEC 426. Before
these studies were completed and brought together
in a systems
study
of requirements
for
initiator
materials
and ways of pr educing thcm, however,
plans for such
were
a high performance
reactor
as an alternate
means of production
needed for security.
He proposed
that the Commission
decision
on the
present paper recognize
that the primary
purpose
of the IWatcrials
Testing
“ 168-

.’