QUESTIONS AND COMMENTS - SUMMARY OF COSTS
NORTHERN MARSHALL ISLANDS RADIOLOGICAL SURVEY

l.

AERIAL - None

2.

GROUND & SEA
Terrestrial

-

Ground monitoring surveys are not included.

-

Soil profile samples, necessary for plant uptake studies are not
included in the minimum figure.

-

Personnel salaries are not stated as being included.

Marine
-

3.

Personnel salaries are not included.

CONTRACTORS
BNL 189 received and costs shown.
It is not known whether
BNL costs are factored into the LLL estimates shown for terrestrial.

Is whole body counting of the No. Marshallese desired?
are shown.

189's not available for Univ. of Wash., and EPA.

No costs

-

It is not

known whether their costs are factored into the LLL estimates for

"Terrestrial" and 'Marine".

CONTINGENCY

Since only the minimum options are listed for the "Terrestrial" and
"Marine" programs, the possibility exists for modifications of these
costs in the upward direction.
Have all salary costs been included?
Have all analytical costs been included?
FY 1980 COSTS
In view of past experience, funds will be necessary to continue
sample analysis into FY 1980. Approximately 300K should be budgeted

for this period.

Have all costs for the final report preparation been included?

Select target paragraph3