Navy Project Manager for coordination and execution of DOD

responsibilities for rendering logistics support to this
survey is Commander, Pacific Missile Test Center, Pt. Mugu,

California.
a.

PHASE I.

Initially, a photographic survey of eleven

(11) atolls and two (2) islands in the Northern Marshall
ee:

Islands will be accomplished utilizing a DON EC-121 aircraft.
This platform has been specially configured to receive DOEprovided high resolution and infra-red capable cameras, plus
additional peripheral support equipment.
(1)

Phase I will be accomplished under the operational

direction of the Project Manager

(COMPMTC), in accordance with

‘the technical direction and advice of the on-site DOE representative and the terms of this MOA.
(2)

COMPMTC will promulgate an appropriate Operations

Order for the accomplishment of the Phase I mission.
b.

PHASE II.

Utilizing data gathered from the foregoing

photographic survey, an
(11)

i

atolls and two

(2)

Aerial Radiological Survey of eleven
islands will be conducted by means of

SH-3G helicopters equipped with DOE-provided radiation detection
and recording instrumentation.

wothe

The helicopters will normally

operate from USNS WHEELING (TAGM=-8), a base support ship which
will, in addition, provide a wide range of logistics support.
Flying relatively precise tracks at specified altitudes and
air speeds, the data collected will be reduced and result in

Select target paragraph3