MILSPAG OPERATING SCHEDULE ENIWETOK AREA = 1 SEP ~ & NOV_1959
USS _IAWRENC’ COUNTY (LST)
Sep
2-20 Sep
Arrive ENIWETOX.
equipment.
.
Offload UDT demolitions and UD?
At ENIWETOK. UPKEEP, logistics fuel and provisions
+&8 necessary.
_
20 Sep
Depart ENIWETOK for WAKE ISLAND for LORAC SUPPORT
5 Oct
Arrive ENIWETOK.
5 Oct-2 Nov
At ENIWETOK, UPKEEP, logistics fuel and provisions
as necessary.
2-5 Mov
load LORAC SUPPORT TEAM and Helicopter and depart
ENIWETOK.
TEAM lift.
Offload and assist establish
LORAC SUPPORT TEAM.
LORAC SUPPORT TEAM SEVEN
icfe
30EM
ACW
5=9 Ost
Establish LORAC TEAM Stations ENIWETOK Atoll.»
9 Oct=2 Nov
Provide NAYAIDS
2-5 Nov
Secure and return LORAC Station equipment to LST.
UNDERWATE? DEMOLITION TEAM DETACHMENT (UDT-12)
2off
‘2 Er*
4, Sep
Arrive ENIWETOK by MATS
5 Sep-9 Oct
Underwater cable trenching
ll Cet-3 Nov
Underwater cable protecting and immobilizing.
9 Nov
When completed depart by MATS
USACS ALEERT J. MYER
3 Oct
9225 Oct
29 Cct=2 Nov
Arrive ENIWETOK. Logistics fuel and provisions as
necessary.
Prepare for cable lays.
lay cables assisted by USS TUG (USS ABNAKI).
Tests with auxiliary temporary cable inside Lagoon
off JAPTAN.
3 Nov
Possible fueling of MYER.
4 Now
Depart ENIWEIUK.
Declassified on 25 Oct 94
By authority of OBNAV
|
i Ie {-
- ¥b~
ane y
Siete get.
i Ee Ee te
ps”
4
Peo
HAND
pe
ENCLOSURE (1)