eee Operation Plan CTG 7,3 No. 1-53 2Be 28f 28¢ 28h 284 & voice circuit to the #0C Eniwetok via a C-47 relay aircraft, in event of failure of channels 24 and 25, ESTES will eactivete chen- 28k J ahtovatt Sn theIVER area. ana Q0C, BILSTON. CDOCMOME Petveen 284 29 nels 28b, 28c, 264 and 281 as requested by TG 7,4 Air Controller, Control DDE guerd channels 28d and 28f as requested by TG 7,4 Air Controller, Eniwetok Ready Duty DDE utilize channel 28) to communi— eate with Eniwetok Control Tower when necessary to scramble F4U fighter aircraft, Channel 28 will be used for IFF checkout betwe CJIF SEVEN Radsefe circuit between Radsefe Operetions Offices in BATROKO and ESTES, Navy will install VRC-10 redios and CJIF SEVEN Radsafe personnel will operate the circuit, ™ 7.1 Administretive Metorola Net et Bikini and Eniwetok, Ships assist EG&G in meking installation in spaces suitable to TG 7,1 and commanding officers, Circuit will be operated by TG 7,1 person-— nel except thet ships may utilize on a not—to—-interfere or operationel necessity basis, — eee eee eee et ESTES, CURTISS end B/IRNKO establish AN/TRC lendline and radio telephone circuits 4n accordance with COI 20-1 circuits J-213, J-214, J~215, J~217, J-218, J-219, J~220, J~320 and J-321, Ships esteblish AN/TRC circuits providing best utilization of equipment depending upon ships! location and operational requirements, or as CTG 7,3 mey direct, The ESTES—Enyu Ciphony circuit is for use between the Firing Perty located in the bunker on Enyw and CJTF SEVEN embarked in ESTES, ESTES personnel will install and maintein ESTES terminal, including remote control units in ESTES JOC and sta Scientific personnel will operate the circuit, TG 7,2 will install gnd maintain bunker ternminel, (. Operations Office (IVY Firirg meee ee ee ee ee ee ee ee ee ee ee ee eee “Blk ~~ Room) 33a 330 33¢ 33d 33e 33f The B..TROKO-TG 7,2 (Joint Communication Center, Eniwetok Island) SIGTOT chennel will be operated continuously during CiSTLE opera~ tional phase, This circuit will be the primary means of passing traffie between TG 7,3 end the shore communication systen, In event of failure of SIGTOT equivment, establish R’TT duplex on same fre—quencies, This circuit will be utilized as an alternate €hannel in the _ . ~evernt_of failure .or overload of di revit. J-22,...020.-20--.4--- e+ [lees Poni