Oreratio

CTG 7.3 No. 1-53

17, CASTIE Roljeup Plan.

Prior to completion of CASTIE, a commmication

roll-up plan will be promilgetec, instructing units as to disposition of

ecrmunication equipment especially procured for CASTLE or IVY.

18, CASTIE COMMUNICATION FEPORT. Prior to departure from the fcrward arca,
all Task Group ships and units shall submit a summary repcrt of conmunication activity during Operaticn CaSTIZ. Compilation of accurate statistics
and evaluation of circuit and equipment capabilities on the cperational
level will enable CTG 7.3 to make specific recommendations for future
planning purpcsese These reports should contain the following informations
ae

TrafficVolume Statistics.

These figures should reflect the

total number of incoming an¢ outgoing messages (exclusive of tactical and

voice racio transmission to which no DTG ws assigned) receiveg via ratio,

mil or visual means an“ processed through the ccrmunications office.
Figures should be tabulatec and should cover the period the unit is under
the operational control of CTG 7.3.

WEEK ENDING
INCOMING

1A

1/7

1/14

1/21

1/28

etc

Plain

Confidential
Secret

Top Secret

OUTGOING
Plain
Confidential
Secret

Top Secret
be. Indicate approximate percentage by precedence of messages handled
in the following categories: Ine-ming plein; incoming classified; outgoing
plain; outgcing classified. Figures my be base¢é upon tabulation of seven

or more average days.

BEST COPY AVAILABLE

c.

Approximite rercentiges of increase or decrease in classified and

ad.

Summerzy of interference noted and technical difficulties encomtered.

plain langugs wessages representee by CASTIE traffic compereé to normal
operating poriocs_

=

on

DNA

pe

Select target paragraph3