-

ATPAC, MENT

DRAFT MEMORANDUM PREPARED 6/28/77
POR THE ATTENTION OF AES
We,

as

concerned citizens

un the ERDA-Marshall

and

scientists participating

Islands Workshop on June

27-29,

2.977,

ave

reviewed the imminent decontamination program for Enevetas
Atoll.
feel

We call your attention the following matters,

that many

aspects of

the proposed program are

since we

economically

and environmentally unaccepvable.
The rationale for removing plutonium-contaminated soil
based on assumptions regarding resusvension of Pu tha: are
validated by empirical data.

Additionally,

is
10t

we question whether

the guidelines which have been established fox SOll removed are
supportable.
However,

we accept that certain contaminted material does

have to be xvemoved and agree that this can be placed under
control

on

Runit

islet.

The present total inventory of plutonium in the terrestrial
environment at Enewetak available for resuspension ana resultant
dose commitment cannot be significantly altered by the proposed
course

of

action.

The removal of soil from Engebi and other islets would cause
a

serious

loss

(humus layer),

of

the

atoll's

most

valuable

terrestrial

which cannot readily be replaced.

The placement of contaminated concrete slurry into
rater does not remove this material
interaction,

rosource

actus

from environmental

since direct occan water connections into the

crater exist;

and present knowledge indicated breakdcwn ana

remobilization of Pu will occur.

We therefore reconmend that the projected soil removal
aspect of the Enewetak
We

recommend

thak vou

cleanup should immediately be reevaluated
reevaluate

specificativ

SOil removal and the Gisposition OF
.

qm

- =

5011225

the basis

for

thal Which 2s vohoven.

Select target paragraph3