Projece Title:
13.

Publications:
Greenhouse, N.A.

and Miltenberzer,

&.?.

Radiological anaivses of

Greenhouse, N.A.

and Miltenberger,

2.2.

External radiation survey and

Marshall Islands environmental samples from 1974 through 1976.
50796 in press.

8NL Report

dose predictions for Rongelap, Utirik, Rongerix, Ailuk, and Wocte Atolls.
BNL Report 50797 in press.
14.

Scove:

(a)
200 Word Summary:
A comprehensive external radiacion survey program
will be conducted on each of the approximacely 13 arslls or islands in the
Northern Marshall Islands which could have received tropospheric fallout from
U.S. muclear weapons cests in the Pacific.
The surveys will provide "ground
truch’ daca on ambient external gamma radiation levels on-island.
This daca
will be used as the dSasis for calibracion and normalization of aerial radioiogical monitoring by £.G.&G.

Corporation.

The program will include detailed

extermal radiation measurements with voressurization chamber and scintillation
survey instruments, and in situ zamma spectrometry on all islands of interesc.
Surface soil samples will be collected and analyzed for significance gamma
amictars in order to make decay corrections for long-term dosa sredictions via
tne external radiation exposure oathway.
BNL field trip start and analytical lab facilities will be avatiaole for

other environmental sample collections and analyses as needed dv the overall

gciencific program.
15.

Relarionshis to Other Projects:
This program is direcely related to our comtinuing envircnmencal and per-

sonnel monitoring efforts under the 3NL Marshall Islands Radiological Satety

ay

Program.
Le will also interact cooperatively with related efiorts ac che
University of Washington (LRE) and Lawrence Livermore Laboratory.

te

\

Extarmal Radiation Measurements and

"Ground Trutn’ for Northera Marshall
Islands Regional Radiological Survev

.

7

Technical Progress in FY 1973:

Personnel and analytical laboratory resources will be mobilized in support
of this program.
If the regional survey begins on schedule, the first or the
three survey legs should be completed by the end or FY 1978.
+

Ly.

«Expected Results

in FY 1979:

The remaining two survey legs will be completed, data analyzed, and a
(See Continuacion Sheet)