of funds. ‘Any such ship] ing costs for this purpose incurred
e June 30, typi will be borne by the AEC, It
guosequentt+
is also recognized that there may be a fewitems of property
in storage at EPG which may be required
either installed
espectively, In such case, allocation
by either AEC or P
“of such property willbe resolved by ALOO and PMR to their
mutual Satisfaction,
vy. will,‘allow AEC to continue using the Marine
Biology Laboratory now located on Parry Island and to
continuejstaging from EPG periodic medical-ecological
studiesof.the possible effects of fallout on Rongelap Atoll.
Navy will* provide logistic support, on a reimbursable basis
to those,AEC and AEC contractor representatives making
£, th Laboratory and staging such studies.
uch;
Ho
eh:
agrees to provide @ periodic radiological survey
of EPG and to advise the Navy of radsafe problems in these
areas so as.to protect the Government of the United States,
Costs for. eurveys specifically requested by DOD will be
borne. by DOD
ending
ermination by AEC as to the continuance of
the AEC Facilities Division, H&N, Inc.,
Los Angeles (the
AEC- prime operating contractor for EPG} AEC and Navy will,
effective July 1, 1960, each assume and pay an equitable
share of the overhead cost of such division, The Commander
Pacific Missile Range for Navy and the Manager, Albuquerque
Operations Office for AEC will immediately undertake to
negotiate a mutually satisfactory method of apportioning
"and paying such costs. The respective AEC and Navy prime
- contracts with Holmes and Narver will appropriately reflect
the method of allocation or apportionment of said costs
_ a8 between the Navy and AEC. The final allocation and
: settlement of said costs as between Navy and AEC shall be
. on the basis of retrospective determination including
' appropriate adjustments.
6. Any Holmes and Narver commitments
rocedures or activities under contracts with AEC designed a insure an unintere
rupted
£1880of’ pu plies’ and material to the EPG on or after
guly2
not be terminated by AEC until such tine
oompletes separate arrangements therefor and the
Commander
MR so advises the Manager, Albuquerque Operations
ffice and Holmes and Narver in writing or until December
1,.1960, whichever is earlier or until such later time as
he Commander, PMR and Manager, Albuquerque Operations
wOffiece may agree, Navy will reimburse AEC for any costs
ote incurs pursuant to this paragraph.
| ake for any activity which the AEC may later need to con-
' duot at the EPG, provided such activity will be accomplished without cost to the DOD and without undue interference
activities of the DOD at ERG.
.¢ with the essential
oR
8 Thefollowing agreements are hereby suspended and
s} Rupereededby this agreement.