PaGE 4 CAl ADMU B1@5 UNCLAS
A CEPLOYMENT OF CHOPPERS TO KWAJALEIN AS A STAGING LOCATION.
I PLAN TO HAVE A FIRM COORDINATED PLAN AFTER DISCUSSIONS WITH
COMSEVENTHFLT AND CINCPACFLT REPS AS SOON AS I CAN REACH
HONOLULU.
4. AT THIS TIME WE ARE IN THE PROCESS OF FLESHING OUT A PLAN
WHICH WILL PERMIT US TO RESUME OPERATIONS AT ENIWETOK ON
NOV 8 IF SAMTEC CAN PROVIDE LIFE SUPPORT. OUR TENTATIVE
‘SCKEDULE OF OPERATIONS WILL BE AS FOLLOWS:
NOV S$ TO NOV 22 - AIRBORNE RADIOMETRIC SURVEY AND PHOTO MAPPING,
‘OV 2059 $34 28 - MARINE AND AIR SAMPLING$ ANALYSIS AND
INTERPRETATION OF RADIOMETRIC SURVEY DATA.
JAN 3 TO COMPLETION - BIOTA AND SOIL SURVEY.
>. CONCURRENT WITH ALL OF THE ABOVE, THE ANALYTICAL AND
INTERPRETIVE EFFORTS WILL CONTINUE WITHOUT INTERRUPTION. PLEASE
NOTE AT THIS POINT THAT WE HAVE ALREADY COLLECTED AND DISPATCHED
A SUBSTANTIAL SAMPLE LOAD. THE MARINE SAMPLE COLLECTION
COMMENCING AGAIN ON NOV 22 SHOULD PROVIDE A WORKLOAD WITHOUT

S. THE PROGRA™ AS OUTLINED RECOGNIZES THAT WE ARE NOW DE-

ard

CAVITATION FOR THE LABORATCRY CAPABILITY.

a a a,

PACE. THUS OUR WINDOW FOR FIELD OPERATION IS LESS CONSTRAINED

a ton

COUPLED FRO™ PALUMBO AND, TO ALL INTENTS AND PURPOSES, FROM

Select target paragraph3