and two water shots in the megaton yield range.

A smaller array extend-

ing to 15 miles was planned for the lower yield Echo shot.*

2.2

LAND AND LAGOON PHASE

The land and lagoon phase of operations took plece at Bikini Atoll
for Shots 1, 2, 3, and 4 and at Eniwetok for Shot 6. In addition exten-

sive preparations for Echo were made at Enivetok. The instrumentation
of the islend and the lagoon raft stations is discussed in Chapter 3.

The preshot preparations at Bikini involved readying the e,uipment, .
calibrating the instruments, and emplacing them at the island ond lagoon

raft stations, This was completed a week prior to Shot 1. final checks
were made on the equipment at all the existing stctions 1 to 2 days

before shot time to assure complete readiness and operational efficiency.
Freparations were also made for the r-covery operations and for the
re-instrumentation of the stations.

Participation in all detonations except Shot 5 was achieved 6lthough

not to the extent originally planned. The lesser participation was due
to the destruction of equipment by the fire:in the compound at Tare fcilowing Shot 1, Tables G.1 through G.20, Appendix G, show the degree of

instrumentation and recovery for each shot.

2.3

SEA PHASE
Free-floating buoys were selected for sampling fallout in the open

ocean on the basis of their evalustion at IVY¥.U/ Each buoy station was
so located that it was expected to drift to the desired positicn by shot
time.

Records were kept of the locations and times of placement and

recovery of each buoy.

From these data, positions at shot time were

estimated by assuming that each buoy drifted in a straight line at a
constant speed, It was essential that the time the buoys were at sea be
held to a minimum so that their locetion at shot time could be estimted
as accurately as possible. For this resson the array for each test was

laid out within 36 hr of the proposed shot time and recovered as soon as

possible afterwards.
_
Sea phase operaticns were mounted from Eniwetok Atoll for all shots.
Detailed direction, once Naval wmits were committed, was accomplished
from ships based at Bikini Atoll or from vessels actively participating
in Project 2.5a operations.

2.3.1

Pretest Preparetions
The buoys and associated equipment were assembled and tested at

Parry Island.

Liaison was estublished with the Navel Task Group and

plans for conducting the sea phase were made. These plans consisted of
loading two sea-going tugs with s,uipment at Eniwetok Atoll, after which
the vessels proceeded to sea to lay the buoys. After compietion of the

buoy leying operctions, the tugs retired to a safe area to await the

shot. Upon receipt of clearance from the Naval Task Group Commander
following the shot, the tugs proceeded to recover buoys after which they

returned to inivetok to off-load,
*

Not fired,

Detailed plans for laying the buoys,