CHAPTER 4

PROGRAM 3 - STRUCTURES
dhe

3.1

Title:

Sponsor:AFSWP-ONR

Performing Agency: Stanford

iG

or

Loading of Structures

Research

Institute

Mr. L. M. Swift

To investigate the‘loading pattern (as a function of time)

imposed upon 4 parallelopiped.,

4.1.2 Procedure
‘.

This project will participete, only in Koon. The project effort
will be confined to Uncle Island\The test structure will be a
6'x12'x6' concrete cubicle with the 12 if dimension normal to the line
from ground zero.

The distance from ground zero to test structure

will be 9507 ft. The front, roof, reap; and one side of the structure
will be instrumented for imposed overpressure... In addition to the
instrumentation on the structure, free field ‘pressures will be measured
at ground surface stations in front of the structure and at ground
and tower stations along a line offset to the south of the structure.
It is also proposed to make Q(4
Zu2) measurementalong this line.

4.1.3

Remarks

This project is designed to extend the data obtai 1ed on similar
test structures in Project 3.1 of UPSHOT-KNOTHULE.
i

4.2

Project Number:

Sponsor:

3.2

Title:

Crater survey anid.

Evaluation

Performing Agency:

AFSWP-ONR

Dr. R. B. Vaile, Jr.
Project
Officer:

SRI+~

Army Map

*Coordinates all agenensae®

33

Select target paragraph3