Dear Mr, LeBarone

-

oA

To facilitate plaming for eilitary participation and support of
atomie tests, the Commission wishes te inform the Committee of its
curreut plans for future full-scale weapons test operations, Three
separate and distinct series will be discussed in this letter.

}

25, 1952

hon

April

yt
A wsomzary cf plans for IVY was forwarded ta you by
our letter of Cetober 29, 1961, together with a copy

of AEG 483/le Since that time the Comiasion ataff and

AEG contractor personne] have continued to work with Joint
Yask Foree 132 and Armed Forces Special Heapons Project
toward IVY and heve participated in drawing up a mutuclly
acceptable technical program, Three changes im the original concept have devhloped. Firat, we now plan to evacuate
all personel from the Atoll prior to the thermonuclear (MIKs)
shot, since the safety of the firing party if left ashore

\

is doubtful,

.

.
‘
-

~-

:

Second, the high-efficiency, high yield

(400-600. KT) fission device (KIEQ@ shot) is scheduled te

-——~

Third, unavoidable delays te date ism engineering, fabricate
ing, and procuring materials fer the cryogenie and other

=
. )

Aue|

voiceMWAC1- S$)

Conieeliea

Lecaten

LG

S25 us

‘

sages

revere sexy
ThE GY

follow the MIZ® shat; eonditions fellowing MIZE permitting,
technical apparatus have forced @ change in scheduled shot

date for MIXR frou Ogtobver } te Novecber 1, 1952,
UPS Hog

aa we

Consideration hes been given to conducting another fulle-

scale test operation (UPSHOT) at the Fevada Proving Ground

following TUMELER-SNAPPER.

We had tentatively planned te

conduet UPSi0f im the Fall of 1952, I¢ has recently bees
determined that UPSHOT camag$ be conducted prior te the early
Spring of 1955. A target date for the beginning of the
operation is February 1, 1953.

These plans, however, must

nentse

Devices for testing during UPSHOT havesot bees com= Leticia pee

pletely determined at this tine.

CLASSIFICATION CANCELLED

“=

fe <

remain subjest tochange in the exent ofunexpected develope nr&