Zt is thought thet a ship of the hospital er smell transport type

fulfilis ths requirements.
(a)

configuretian
Io addition te small leborctory and ahop space, a totel area of

clear deck space ef seme 10,000 square feet is required. This
spece can be severel small areas in which stabilized reder or
optically tracked armament mounts wuld be instelled to support

a

te}

fireball cameras, mirrer systexs, fest caneras, and other diagnostic equipment.

Communications
Ynis ship should be equipped vith commmications adequate to provide
votes and teletype links to Enivetek and Bikini carrying secret
restricted data classifications. During the operstional phase the

the ship would serve eas the csummications center fer TG 7.1 and

5G 7.5 end no ecommnications wuld be installed ashere other than
the tenperary ecnstructicn net mentioned previeusly. All ccazamiestioss ship te shere cr ship to barge would be by radio.

(2)

Cost
Tt ts estimated that the cost ef resetablichine sen worthiness upon

rexoval fron reserve fleet storege vould be $160,009 to $260,000
Gepsnding en the present condition ef the ship chesexn.

fhe cost of reconficuretion and instelleion of stabilized platforms,

shops, end commmicstions would be in tie range af $750,000 to
$1,005,000.

In ant aut costs for storage becczen operations are estimated at

$150,000.

If erproval to tois proposal is given, a decision te wiilize a ebip such as the

Certiss or Ectee for this purpose may be the correct ons snd certetniy these
ehips weuld be adequete. eee ee oe ate eres th SERLY, Dovevers
since some work would be necessary in providing querters, and even though these
ehiys are now in comission. Tis, the tetel eost for providing a diagnectic

ship, exclusive of operating costs, is estimated at $1,000,000 to $1,250,000.

Ancther factor to be considered fn a support discuseion concerns the eleud
sexgiine ecpability. MInfermal discussions tniicate thet the maintenance of
Gua} firing expability between any tue of the three atclis can be accomplished
with tae presentiy requested number cf sampling airereft. It is believad that

Schedule IT above dees not earflict with this staterment.

2f, however, it ws

ood een edert cane ee eeiaity, in even @ two day period,
eAditiesnl sampling eircraft would be required. Im any case, the primry
mathed ef sempling at Teong! vill be by airereft, net reckete, and the present
plans have inelused a review of the feasibility of sexpling vith the B-S7's
Tequected new.

=

pov

i

Select target paragraph3