Cost Eetanates. The items of = contemplated and the cost estimates are sumuerized
in the folloving tables:
Minimm Reqgiirements
ITER

ESTIMATED COS?

Le

Beachbead

3.

Access Chernel - 20' Beep

6.

Five (5) Earge Anchorages

2.
k.
5.

Te

8.
9.

12,000

Camp (as Fox-Redwing)

325,000

686,000

Conerete Station (As Station 70 - Redving)
300' Steel Tower (As Station 5- Redring)

295,000
343,000

Inter -Atoll Communications

243,000

—

Submarine Cable
Seadrane

TOTAL MINIMAL CONSTRUCTION

222,000
200,000
96,000

2,422,000

RECAPITULATION

Construction Equipment

471, 340

Operetionsl] Equipmen?

35,000

Construction Projects

2,422,000

TOLAL

2,928, 340

Maxizern Reoviremenuts
ITEM

ESTIMATED Cost

1.
2.
3.

Peechhesd
Camp - 200-Men
Airstrip

5.

3 Concrete Scations as Redvinz

4,
6.
T
8.

9.

10.

ll.

12.

13.

12,003
450,000
560, 000

Access Chenrsl - 20"

Pive (5) Barge Anchocages
Seadroame Facility
Ieter-Atoll Commmicuticns
Suttarine Cable

300' Steel Tover

Coserete Station (Redwing - Station 70)

Acesss Roeds and Causeways

Mole Type Pier

TOTAL CONSTRUCTION

686 , C02

1,013,000

222,000
96,000
243,000
613,000

343,000

295,000
180,000

98,000

4,811,000

RECLPITILATION

Construction Equipmass

1,022,510

Construction Project:

& 812,605

Operaticrnal Equimen:

50,000

TCTAL
@his is the end of the quotation from

EH
Task Group 7.5 report. }
Lan, Rr.

5,883,510