Naval Radiological Defense Laboratory
USNRDL-TR-363
ANALYSIS OF STANDARD-~PLATFORM WIND

BIAS IN FALLOUT COLLECTION AT OPERATION
REDWING, by H. Chan, 16 September 1959 48 p.,
tables, illus., 10 refs.
UNCLASSIFIED

At Operation REDWING, fallout sampling was
conducted by arrays or groups of similar collecting
instruments. Each array was located on the
periphery of an elevated and circular windshielded platform designated as the
standard platform. A correlation of
the sampling variations in the amounts
(over)

Naval Radiological Defense Laboratory

USNRDL-TR-363
ANALYSIS OF STANDARD-PLATFORM WIND

BIAS IN FALLOUT COLLECTION AT OPERATION
REDWING, by H. Chan, 16 September 1959, 48 p.,
tables, illus,, 10 refs.
UNCLASSIFIED

At Operation REDWING, fallout sampling was
conducted by arrays or groups of similar collecting
instruments, Each array was located on the
periphery of an elevated and circular wind-

1, Atomic bomb test$ Meteorological factors.
2. REDWING (Operation) Fallout monitoring.

Naval Radiological Defense Laboratory
USNRDL-TR-363

I, Chan, H.

REDWING, by H. Chan, 16 September 1959, 48 p., I. Chan, H.
tables, illus. , 10 refs.
UNCLASSIFIED
II, Title.

Il, Title.
Ill. NS 081-001.

UNCLASSIFIED

1. Atomic bomb tests Metenrological factors.
2. REDWING (Operation) -

Fallout monitoring.
I, Chan, H.

II, Title.
TI. NS 081-001.

shielded platform designated as the

standard platform. A correlation of

the sampling variations in the amounts
(over)

UNCLASSIFIED

ANALYSIS OF STANDARD-PLATFORM WIND

BIAS IN FALLOUT COLLECTION AT OPERATION

1, Atomic bomb tests Meteorological factors.
2. REDWING (Operation) Fallout monitoring.

At Operation REDWING, fallout sampling was
Ill. NS 081-001.
conducted by arrays or groups of similar collecting
instruments. Each array was located on the
periphery of an elevated and circular windshielded platform designated as the
standard platform. A correlation of
the sampling variations in the amounts
(over)

Naval Radiological Defense Laboratory
USNRDL-TR-363

ANALYSIS OF STANDARD~PLATFORM WIND

UNCLASSIFIED

1. Atomic bombtests ~
Meteorological factors.
2. REDWING (Operation) ~

BIAS IN FALLOUT COLLECTION AT OPERATION
Fallout monitoring.
REDWING, by H. Chan, 16 September 1959, 48 p. I, Chan, H.
tables, illus., 10 refs.
UNCLASSIFIED
Il, Title,
At Operation REDWING, fallout sampling was
I. NS 081-001.
conducted by arrays or groups of similar collecting
instruments, Each array was located on the
periphery of an elevated and circular windshielded platform designated as the
standard platform. A correlation of
the sampling variations in the amounts
UNCLASSIFIED
(over)

Select target paragraph3