HICKORY
- a
June
rier
OAK
-
Yield
,
Expected
Actual
2
B
June 28
OES
Bebutidd
7.5 MT
Objective
Trheias
rpeTn
[oie PED
Thr SEE
9.35 MT
Prototype
test
mp enn
PELERED
10.: The preliminary results revealed that the yield of
several of the devices (those indicated by an asterisk) fell
‘substantially short of expectations,
To obtain further data
for the particular developments involved, additional tests vere
planned,
Additional shots were also scheduled to take advantage
of recent weapon research within the laboratories and to meet the
need expressed by the Department of Defense for early development
of specified weapon systems,
ll. Six of the seven shots listed in the January-March report
and not fired by June 30 continued cto be scheduled, the one
exception being the elimination of the BUCKEYE shot, listed as
a contingent shot,
Test firings added to the schedule included
the LINDEN shot, fired June 17, and the following:
Shot name
Ready
SEQUOTA
July 1
DOGWOOD
July 5
PISONIA
July 15
end device
owed
.
Gate
pwd
ben
Expected
yield
.
Objective
cn
PINE
July 27.
OLLVE
July 28
iS
=
A
yee
3
-h-
"
.
Part IIt