FIELD SKETCHES (Continued) FIELD SKETCH NO, REVIS- ION NO, DESCRIPTION DATE 603 Gasoline & Diesel O11 Meter & Motor Valve By-Pass 604 Valve Identification Tags, P.O.L. 3-23-51 605 Typical Control Piping, P.O.L. 32h51 606 Dehydrator Drain Tank, P.O.L. 3-28-51 607 Loading Rack Area, P.O.L. 3-27-51 608 Liquid Level Control System, P.O.L. 3-31-51 609 Guard Posts, P.O.L. 3-31-51 610 Dyke Crossing, P.O.L. 3-30-51 611 Drain Manifold, P.O.L. 3-26-51 612 Primary Isolating Fuses, Location "5" 3-27-51 613 For Van Sickle 3-30-51 él, Locations & Orientation of Photo Flares, 615 Electrical Plan, Group Headquarters, Bldg, 15, Location "A" 3~30-51 616 Submarine Telephone Cable 3-31-51 617 Personnel Landing & Cargo Pier, No. 126, Location "Cc" 4-4-51 618 Personnel Landing, Causeway, Location "D# 4-6-51 619 Marine Ramp Repairs, Precast Conerete Slabs, Location 4-6-51 620 Concrete Reservoir, Fresh Water Station, 621 Garbage Can Wash House No. 2, Bldg. 254, Location "B® 4-11-51 622 Timber Grease Rack, Location "A" 4-14-51 623 Piping, P.O.L. Locations "E" & "S4 Location "B* _ Distillation Unit Piping, Power & Water Distillation Plant, Bldg, 56, Location "A" 3-17-51 3—30-51 4-6-51 4-14-51 113