FIELD SKETCHES (Continued)
FIELD

SKETCH

NO,

REVIS-

ION

NO,

DESCRIPTION

DATE

603

Gasoline & Diesel O11 Meter & Motor Valve By-Pass

604

Valve Identification Tags, P.O.L.

3-23-51

605

Typical Control Piping, P.O.L.

32h51

606

Dehydrator Drain Tank, P.O.L.

3-28-51

607

Loading Rack Area, P.O.L.

3-27-51

608

Liquid Level Control System, P.O.L.

3-31-51

609

Guard Posts, P.O.L.

3-31-51

610

Dyke Crossing, P.O.L.

3-30-51

611

Drain Manifold, P.O.L.

3-26-51

612

Primary Isolating Fuses, Location "5"

3-27-51

613

For Van Sickle

3-30-51

él,

Locations & Orientation of Photo Flares,

615

Electrical Plan, Group Headquarters, Bldg, 15,
Location "A"

3~30-51

616

Submarine Telephone Cable

3-31-51

617

Personnel Landing & Cargo Pier, No. 126,
Location "Cc"

4-4-51

618

Personnel Landing, Causeway, Location "D#

4-6-51

619

Marine Ramp Repairs, Precast Conerete Slabs, Location

4-6-51

620

Concrete Reservoir, Fresh Water Station,

621

Garbage Can Wash House No. 2, Bldg. 254,
Location "B®

4-11-51

622

Timber Grease Rack, Location "A"

4-14-51

623

Piping, P.O.L.

Locations "E" & "S4

Location "B*

_ Distillation Unit Piping, Power & Water
Distillation Plant, Bldg, 56, Location "A"

3-17-51

3—30-51

4-6-51

4-14-51

113

Select target paragraph3