FIELD SKETCHES (Contimed) FIELD SKETCH NO, REVISION NO, DESCRIPTION DATE 473 Power & Water 2-14-51 47k PowerFostStation for Stations 9 4,75 (See F.S.639) 475 Typical Maintenance Schedule for Plants 4,76 As Built for Corps of Engineers, Bldgs. 1 &7 477 As Built for Corps of Engineers, Bldg. 3.1.3 2-19-51 478 Foundation for Generator No. 2, Power & Water Distillation Plant, Bldg. 108, Station 100, Location "D¥ ene3-51 479 (See F.S.640) a17—-51 479 Reefer Shelter, Bldg. 210, Location "B®" ame3—51 480 Radar Reflector Targets, Location "C" 2-24-51 481 Layout for Station 721 at End of Existing Jetty RaneT—=51 482 Salt & Fresh Water Systems, Location "C" A=—28—51 483 Sewer System, Location "C* R=28—51 484, Special Details, Bldgs. 329 & 330, Location “B" 3-1-51 485 Primary Isolating Fuses, Location "C" (PFL) 3-1-51 486 Primary Isolating Fuses, Location "D" (PFL) 3-1-51 487 Chain Hoist Frame 3-2—51 488 Office Dehumidification, Bldg. 329, Location "B" 3—2—51 489 Block Diagram, Cable Runs 3=—3—51 490 Electrical Power Generating Plant Control Diagram, 491 Group Headquarters, Bldg. 15, Location "A", Floor Plans & Elevations (2 Sheets) 3-5-51 4,92 Scaffolding for Bldg. 5, Station 3.1.1, Location "5" 3=—5—51 154+, 21%, (3.1.1) Typical Losations "C", "D", & "EM 2-8-5] 2—-8-—51 2-19-51 2-19-51 365=51