FIELD SKETCHES (Contimed)
FIELD
SKETCH
NO,

REVISION
NO,

DESCRIPTION

DATE

473

Power & Water

2-14-51

47k

PowerFostStation for Stations 9

4,75

(See F.S.639)

475

Typical Maintenance Schedule for Plants

4,76

As Built for Corps of Engineers, Bldgs. 1 &7

477

As Built for Corps of Engineers, Bldg. 3.1.3

2-19-51

478

Foundation for Generator No. 2, Power & Water
Distillation Plant, Bldg. 108, Station 100,
Location "D¥

ene3-51

479

(See F.S.640)

a17—-51

479

Reefer Shelter, Bldg. 210, Location "B®"

ame3—51

480

Radar Reflector Targets, Location "C"

2-24-51

481

Layout for Station 721 at End of Existing Jetty

RaneT—=51

482

Salt & Fresh Water Systems, Location "C"

A=—28—51

483

Sewer System, Location "C*

R=28—51

484,

Special Details, Bldgs. 329 & 330, Location “B"

3-1-51

485

Primary Isolating Fuses, Location "C" (PFL)

3-1-51

486

Primary Isolating Fuses, Location "D" (PFL)

3-1-51

487

Chain Hoist Frame

3-2—51

488

Office Dehumidification, Bldg. 329, Location "B"

3—2—51

489

Block Diagram, Cable Runs

3=—3—51

490

Electrical Power Generating Plant Control Diagram,

491

Group Headquarters, Bldg. 15, Location "A", Floor
Plans & Elevations (2 Sheets)

3-5-51

4,92

Scaffolding for Bldg. 5, Station 3.1.1,
Location "5"

3=—5—51

154+, 21%,

(3.1.1)

Typical Losations "C", "D", & "EM

2-8-5]
2—-8-—51
2-19-51

2-19-51

365=51

Select target paragraph3