FIELD SKETCHES (Continued) FIELD SKETCH NO. REVISION NO, DESGRIPT ION DATE 245 Meals Served, Daily 7-31-50 246 Daily Power Generation Chart -_—- 247 Organization Chart, Construction Department 3-7-50 248 Organization Chart, Adminstration 8-7-50 249 Structural Status Chart 8-1-50 250 Organization Chart, Engineering and General 8-7-50 251 Location Change, 3.0.1.J (Traced from SK635) 81-50 252 Fire Protection, P.O.L. Facilities, 253 Dispensary, Location "E" 8~3-50 254 General Layout, Small Scale, Location "B" 8-350 255 Blueprint Paper Storage Box 8-5~-50 256 Exhaust System, Bakery Oven, Location "B" 38-5-50 257 Recreation Building, Loeation "B" 8~5-50 258 Exhaust Ventilators, Mouse House, Location "L" 8~5-50 259 Theatre Shelter Extension, Location "B" 8-8-50 260 Crypto Vaults, Location "A" & Location "B" 8-9-50 261 Center of Gravity Diagram, Bldg. 3.3.4, Location "S" 8-11-50 262 Bldg. for Crash Protection, Jeep & Trailer, Location "B" to "El" 8-11-50 263 Revised Piping Details, Salt Water Pump Sta., Location "B" 8-24-50 264 Conerete Grease Pit, Loeation "C" & "pn 8=-24-50 265 Concrete Bar-B-Que Pit 8-24-50 266 Revised Salt Water Feed to Distillation Units, Location "B" Location "L" 100 38-1-50 8-24-50