FIELD SKETCHES (Continued)
FIELD
SKETCH
NO.

REVISION
NO,

DESGRIPT ION

DATE

245

Meals Served, Daily

7-31-50

246

Daily Power Generation Chart

-_—-

247

Organization Chart, Construction Department

3-7-50

248

Organization Chart, Adminstration

8-7-50

249

Structural Status Chart

8-1-50

250

Organization Chart, Engineering and General

8-7-50

251

Location Change, 3.0.1.J (Traced from SK635)

81-50

252

Fire Protection, P.O.L. Facilities,

253

Dispensary, Location "E"

8~3-50

254

General Layout, Small Scale, Location "B"

8-350

255

Blueprint Paper Storage Box

8-5~-50

256

Exhaust System, Bakery Oven, Location "B"

38-5-50

257

Recreation Building, Loeation "B"

8~5-50

258

Exhaust Ventilators, Mouse House, Location "L"

8~5-50

259

Theatre Shelter Extension, Location "B"

8-8-50

260

Crypto Vaults, Location "A" & Location "B"

8-9-50

261

Center of Gravity Diagram, Bldg. 3.3.4,
Location "S"

8-11-50

262

Bldg. for Crash Protection, Jeep & Trailer,
Location "B" to "El"

8-11-50

263

Revised Piping Details, Salt Water Pump Sta.,
Location "B"

8-24-50

264

Conerete Grease Pit, Loeation "C" & "pn

8=-24-50

265

Concrete Bar-B-Que Pit

8-24-50

266

Revised Salt Water Feed to Distillation Units,

Location "B"

Location "L"

100

38-1-50

8-24-50

Select target paragraph3