Repredyced frqmImidingspfiithe National Archives
77 TF
RRA :BRBemy
Pola
3/13/57
AT STEN
PEs DOR
t 5,
E.0. 98, Rev. 2
Page 2
Lgoe
CARLA sMYOUu SENISGALLI To
DTANE S&S.
2.
~ ~ PacificSouthwest Région
Nisok
The plen for the four new weather stations is to be based on the Tarawa plan,
with minor excertions, namely:
a.
Move entennas so that not more than 150! of drop-lead to the Operations
b.
love the latrine from the barracks building to the day room and provide a
Building No. S is necessary.
if required.
The antenna can be directly over the building
Shed for laundry facilities.
These instructions supersede the design requirements for weather stations in
pararraph 3 of JTF-7 letter.
the Wotno Station.
3.
The Rad-Sefe Station is still to be similar to .
Review the generator capacity at the existing stations to ascertain if it is
sufficient to carry the additional load of the ice making machine and electric
grill requested in paragraph 7 of JTF-7 letter.
required meke provisions in your estimate.
If larger generators are
"Therefore, you are requested to prepare an estimated construction schedule which
will show the number of days required after notification of availability of funds."
Teletype reference
(C) is quoted as follows:
"HOHNER TO SANDERS INFO LT COL WALTER A GRAY.
REF MY LTR ETE:FWH-3)3 DATED FER 26,
1957 IN REGARD TO WEATHER AND RAD-SAFE STATIONS.
DUE TC MISINTERPRETATION OF
REQUESTED CCMFLETION DATE DISREGARD FIRST SENTENCE OF NEXT TO LAST PARA AND ALL OF
LAST PARA CF LTR.
PROVISIONS WILL BE MADE FCR FUNDING OF CONST IN FY 195€ EUDGET
NCW UNDER PREPARATION.
REF ETE: FWH-3)5"
Authorized for Enrineering
and Desirfn:
Frea
a
AEC
“. Hohner
‘WT
Contract
Lhe
Oo. P. Howell
2
Repr
somtative
Project HManarer
VL Bony
R. R. Alvy
mneineering tlonaper
(For Distribution, see Page 3)
~GEEHPCOLALSSEUTTY
E.0. 98, Rev. 2