Reprodaced from the holdings of the National Archives CEPT _ I Soulibesh Region a, i9g4HOLMES & NARVER, “ai GAnEY po INC. Engineers-Constructors AQGOLO Ke . | Contract No. AT-(29-2 )-20 RRA: ERBimy . 3/13/57 E.0. 98, Rev. 2 Typed: To? Project Engineering File Job: From: Chief Froject Engineer Re: March 13, 1957 9he Rehabilitation of Rad-Safe Stations at (1) Wotho, (2) Ujelang and (3) Utirik NATIONAL ARCHIVES REPOSITORY JACiEiC S0vTHMEST KEGION ACTION ATOMIC ENEKGY COMMISSION RESIDENT MANAGER, EPG; Chief Est i@@tbecrion £4326 Identification No. Item (1) - 19600 (2) - 19610 _ (3) - 19620 BOX No. S26 70 #29) Albi 326-658 730 FOLOER M4uky i3cAva ~ 1D Ms 1953 (A) Confidential letters J-l/000.93 dated 2-11-57, 2-1-57, iteference 1-36-57 and 1-28-57 may be seen in Project Engineer Files. Copies of same will be transmitted to Jobsite. (B) Letter ETE:FWH 343 dated 2-26-57 (H&N 36228). (C) Teletype Hohner to Smders dated 2-27-57. lM Aecount No. 5005/5105 Hescrintion of Work o = he issue of this Engineering Order authorizes the above action addressees to prepare operete plan sets, sepsrate cost estimates and construction time schedules for rehabilitation of eacn of tne Rad-Safe Stations at Sites Wotho, Ujelang and Utirik, all in eccerdance with requirements outlined in Paragrarnns 6 and 7 of reference confidential letter (A) dated February 11, 1957, as modified by reference letter (B), corrected with roference Teletype (C). Flans and cost estimates will be forwarded to Home Office Estimating Department for Surtner processing. Reference Letter (B) is quoted as follows: D "You are hereby authorized to design and prepare estimates for Weather and Red-Safe Stations as requested in JTF-7 letter dated February 11, 1957. "Wlstimates should be prepered for each single location for both the new stations anc the rehabilitetion of existing stations es funding for this prceject has not been definitely determined. i ering recent meetings in Washington various surrestions in rererd to desirn were o°fered as follows: = A m a 1 anss for potable water ere to be fabricated cf non-corrosive material.

Select target paragraph3