experiment by putting the shelter of the gauge station close to the water's edge and

we will try to eliminate the water vapor by building a blast shield which will be
triggered by the shock wave and will remove itself shortly thereafter.

There will be something like 35 samples loaded in a concrete block, 4' wide x
5* tall. Some of these samples will require photocouple instrumentation which will
have 18 channels of thermo couples, three channels of thermal flux measurement and
one channel of overpressure. The recording shelter will be some 20' in back of the
gauge location. The project will require four peeple in the FA from April 23 to D/10.

Mr. Campbell has our preliminary construction requirements already and we will try

to submit the final drawings next week.
There were no questions.

Select target paragraph3